48:3-17a. Public utility pole or underground facility placement; municipal consent required; procedures, enforcement.
1. a. After the effective date of P.L.1991, c.366 (C.48:3-17a), before a public utility places a pole, used for the supplying and distributing of electricity for light, heat or power, or for the furnishing of telegraph, telephone or other telecommunications service, on a public right of way on which the predominant method of lighting is gas lighting, a public utility shall, in addition to any other requirements of law, first acquire the consent of the governing body of the municipality in which the public right of way is located.
b. After the effective date of P.L.2004, c.154, before a public utility places, replaces or removes a pole or an underground facility located in a single municipality within a 24-hour period, which pole or underground facility is used for the supplying and distribution of electricity for light, heat or power, or for the furnishing of water service or telephone or other telecommunications service on or below a public right of way in that municipality, the public utility shall, in addition to any other requirements of law, notify an appropriately licensed municipal code official of the municipality at least 24 hours before undertaking any construction or excavation related to the placement, replacement or removal of such pole or underground facility. The provisions of this subsection shall apply only to a municipality where the governing body of that municipality has first adopted an ordinance requiring the notification of a public utility that provides service in that municipality of the application of the provisions of this subsection in the municipality. For the purposes of this section, ~underground facility~ means one or more underground pipes, cables, wires, lines or other structures used for the supplying and distribution of electricity for light, heat or power or for the providing of water service, or for the furnishing of telephone or other telecommunications service.
c. After completing the placement, replacement or removal of a pole or an underground facility pursuant to this section, the public utility shall remove from such right of way any pole or underground facility no longer in use as well as any other debris created from such placement, replacement or removal and restore the property including, but not limited to, the installation of a hot patch as needed to restore the property within the right of way to its previous condition as much as possible. As used in this section, ~hot patch~ means the installation of a mixture of asphalt to restore property within the right of way to its previous condition subsequent to the construction or excavation of a site required for the placement, replacement of a pole or an underground facility pursuant to this section.
d. For the purposes of this section, ~pole~ means, in addition to its commonly accepted meaning, any wires or cable connected thereto, and any replacements therefor which are similar in construction and use.
e. In the event a public utility does not meet the requirements of subsection c. of this section concerning the removal of debris and the restoring of property including, but not limited to, the installation of a hot patch, within a right of way to its previous condition within 90 days of placement, replacement or removal of a pole or an underground facility, the municipality shall be authorized to impose a fine up to an amount not to exceed $100 each day until the requirements of subsection c. are met, except that if the public utility is unable to complete the installation of a hot patch due to the unavailability of asphalt material during the period of time from November through April, the public utility shall not be required to complete the hot patch installation until 60 days immediately following the end of the November through April period. At least five business days prior to the end of the 90-day period established by this subsection, the municipality shall notify the public utility that the penalties authorized by this subsection shall begin to be assessed against the utility after the end of the 90-day period unless the utility complies with the requirements of subsection c. of this section. Any penalty imposed shall be collected or enforced in a summary manner, without a jury, in any court of competent jurisdiction according to the procedure provided by ~The Penalty Enforcement Law of 1999,~ P.L.1999, c.274 (C.2A:58-10 et seq.). The Superior Court and municipal court shall have jurisdiction to enforce the provisions of this section. In the case of removal or replacement of a pole or an underground facility utilized by two or more public utilities, the public utility last removing its pipes, cables, wires, lines or other structures shall be liable for the removal and restoration required under subsection c. of this section, unless a written agreement between the public utilities provides otherwise.
f. Under emergency conditions which significantly impact the placement of a pole or underground facility resulting from natural forces or human activities beyond the control of the public utility, or which pose an imminent or existing threat of loss of electrical, water, power, telephone, or other telecommunication service, or which pose an imminent or existing threat to the safety and security of persons or property, or both, or which require immediate action by a public utility to prevent bodily harm or substantial property damage from occurring, the provisions of subsection b. of this section shall not apply when a public utility undertakes any construction or excavation related to the placement, replacement or removal of a pole or an underground facility in response to such an emergency, provided that the public utility undertaking such construction or excavation notifies the appropriately licensed municipal code official of the municipality in which such construction or excavation occurs at the earliest reasonable opportunity and that all reasonable efforts are taken by the public utility to comply with the removal and restoration requirements of subsection c. of this section after responding to the emergency.
L.1991,c.366,s.1; amended 2004, c.154.
48:3-17.1. Presumption from occupancy; action for removal of poles barred in 10 years
Whenever a public utility corporation subject to regulation by the Board of Public Utility Commissioners of this State has occupied a public highway, street or other public place in this State by the placing of a pole or poles in, on or along any such public highway, street or other public place for the purpose of supplying and distributing electricity for light, heat or power, or for furnishing telegraph or telephone service, and the use and occupancy, as aforesaid, by such public utility corporation has continued at substantially the same location or locations for a period of ten years, then and in that case, such occupancy shall be presumed to be with the consent in writing of the owner of the soil upon which such pole or poles have been placed, and no suit, action or proceeding shall lie in any court of this State for the removal of any pole or poles so placed and used, unless the same shall be instituted within ten years from the time of the original occupation, as aforesaid, of said public highway, street or other public place.
L.1945, c. 231, p. 747, s. 1, eff. April 25, 1945.
48:3-17.2. Definitions
As used herein:
(a) ~public utility~ means any public utility defined in 48:2-13;
(b) ~right of way~ means the area devoted to passing over, on, through or under lands with utility plant facilities as part of a way for such purpose;
(c) ~easement~ or ~easement rights~ means privileges essential or appurtenant to the enjoyment of a right of way; and
(d) ~street~ means any highway, road, street, alley, lane or place dedicated to public use whether or not accepted and whether or not subsequently vacated and includes the sidewalk area and other areas between the sidelines thereof.
L.1957, c. 130, p. 510, s. 1. Amended by L.1962, c. 198, s. 40.
48:3-17.3. Recording of grants; effect as constructive notice
The recording of any grant of easement or right of way to any public utility, and any corporation operating pipeline facilities within or through the State shall not constitute constructive notice thereof beyond 1 year from the date of such grant unless
(a) the principal facilities to be constructed on such right of way are to be located within the limits of any street, or
(b) such grant contains a particular description of the location of the right of way so granted, or
(c) there is attached to and recorded with such grant a map, plat or sketch showing the location thereof with sufficient reference to boundaries or monuments of record to permit the location to be established by survey, or
(d) prior to the expiration of such 1-year period, there is separately filed or recorded with the county recording officer with whom such grant was originally lodged for recording a map, plat or sketch complying with the provisions of clause (c); provided, however, the provisions of chapter 358 of the laws of 1953 shall not apply to any map, plat or sketch required to be filed or recorded under the provisions of this act.
L.1957, c. 130, p. 510, s. 2, eff. Jan. 1, 1958.
48:3-17.3a. Notice of development applications
6. Within 30 days after the effective date of this act, the Board of Regulatory Commissioners shall notify the corporate secretary of every public utility regulated by the board that, in order to receive notice by an applicant pursuant to subsection h. of section 7.1 of P.L.1975, c.291 (C.40:55D-12), the public utility shall register with any municipality in which the utility has a right-of-way or easement.
L.1991,c.412,s.6.
48:3-17.4. Effect of act on previously granted easement rights
Nothing herein contained shall limit or modify the exercise by any public utility as herein defined, or by any corporation operating pipeline facilities within or through the State, of any easement rights heretofore granted to it.
L.1957, c. 130, p. 511, s. 3, eff. Jan. 1, 1958.
48:3-17.5. Effective date
This act shall take effect January 1, 1958.
L.1957, c. 130, p. 511, s. 4.
48:3-17.6. Authority to take property
Any of the following types of public utilities now or hereafter organized and existing under and by virtue of any law of this State: electric light, heat and power; canal; gas; pipeline; railroad; underground railroad; sewerage; solid waste disposal as defined in section 3 of P.L.1970, c. 40 (C. 48:13A-3); water power; street railway or traction; telegraph or telephone; or water, in addition to and not in substitution of whatever other right, power and authority it may have and possess, may, subject to the restrictions as provided hereinafter, take or acquire under the provisions of P.L.1971, c. 361 (C. 20:3-1 et seq.), such property or other interest therein which may be reasonably necessary for the purposes enumerated for each such utility in the succeeding sections hereto. In the case of solid waste disposal facilities, the condemnation proceeding may not commence unless the Department of Environmental Protection finds, pursuant to the provisions of section 17 of P.L.1975, c. 326 (C. 13:1E-26) that the site to be taken is a suitable site for a solid waste disposal facility, and that it will not pose an undue risk to the environment or public health.
L.1962, c. 198, s. 48. Amended by L.1984, c. 214, s. 1, eff. Dec. 17, 1984.
48:3-17.7. Necessity; application; notice and hearing; rules and regulations
The power of condemnation shall not be used or enforced by any such public utility unless the necessary land or other property or any interest therein as stated in this chapter, cannot be acquired from the owner by reason of disagreement as to the price or legal incapacity or absence of the owner, or inability to convey a valid title, or because the names or addresses of the owner or owners may be unknown, or for any other reason. Except where a governmental agency having jurisdiction has granted the utility the permission to take or acquire property or any interests for the utility@s purposes the power of condemnation shall not be used or enforced by any public utility until and unless such utility shall have applied to the Board of Public Utility Commissioners upon the petition of such utility and the board, after due notice, including notice to the owner or owners of the land or other property or interest therein to be condemned, and to any other parties having an interest of record therein, if known and resident of this State, and if unknown or not resident of this State, then by such publication as the board shall prescribe, and public hearing, shall have found that the land or other property or interest therein desired is reasonably necessary for the service, accommodation, convenience or safety of the public, and that the taking of such land or other property or interest therein is not incompatible with the public interest and would not unduly injure the owners of private property. The board is hereby authorized and empowered to determine the necessity as aforesaid for the use of the land or other property or interest therein so sought to be condemned and to make and establish such reasonable rules and regulations governing the form and method of such application and the time and manner of the notice of such public hearing as it may deem proper, and the board shall have full power and authority to enforce the provisions of this section.
L.1962, c. 198, s. 49.
48:3-17.8. Taking of state property prohibited
No public utility shall take by condemnation any land, property, or other interest belonging to the State of New Jersey.
L.1962, c. 198, s. 63.
48:3-17.9. Definitions
As used herein:
(a) ~Public utility~ means any public utility defined in 48:2-13;
(b) ~Right-of-way~ means the area devoted to passing over, on, through or under lands with utility plant facilities as part of a way for such purpose;
(c) ~Easement~ means privileges essential or appurtenant to the enjoyment of a right-of-way; and
(d) ~Emergency~ means any time a public utility service is interrupted or in immediate danger of being interrupted by the elements or by any other cause or when the condition of the equipment of the public utility is in need of immediate repair to prevent injury to persons, or damage to property.
L.1969, c. 182, s. 1.
48:3-17.10. Notice to landowner before entry
It shall be unlawful for any public utility to enter upon any lands in which it has acquired an easement or right-of-way, for the purpose of erecting, installing, moving, removing, altering or maintaining any structures or fixtures thereon, other than structures or fixtures owned by the public utility, or for the purpose of maintaining such easement or right-of-way by clearing, moving, cutting or destroying any trees, shrubs, plants or other growth thereon, unless and until not less than 5 days@ notice of such entry shall be given to the owner of the lands subject to such easement or right-of-way personally or by certified or registered mail addressed to the owner at his address as shown by the assessment records of the municipality in which the land is situate, but nothing herein shall prohibit entry without notice in any case
(a) Of an emergency, or
(b) Where such notice is waived by the owner, or
(c) Where the easement or right-of-way contains an express provision permitting entry without notice or upon notice of a lesser period of time, which is complied with, or
(d) Where the owner consents to the entry of the public utility for such purposes, or
(e) Where the structure, fixture, tree, shrub, plant or other growth, or portion thereof, to be dealt with as aforesaid, is located over, on, through or under any public street, road, highway or other public thoroughfare.
L.1969, c. 182, s. 2.
|